Permit Requirements

Garage permit in Scottsdale, AZ

Yes — you need a permit for garage work in Scottsdale.

An attached garage always needs a building permit (it is part of the dwelling structure). A detached garage is an accessory structure: Scottsdale's only permit exemption for detached accessory structures covers tool/storage sheds, playhouses and similar uses of 200 square feet or less. A garage is neither that use nor typically that small, so building an attached or detached garage requires a permit.

The numbers
Permit needed? Yes
Where the line falls Over 200
Fee The code does not print a dollar amount. Fees come from the City of Scottsdale fee schedule.
Review time Not in the ordinance
Code section 105.2 Work exempt from permit, Building item 1 (Sec. 31-5) — accessory-structure exemption capped at 200 sq ft for sheds/playhouses; garages not exempt
Based onIRC 2021 as adopted and amended by Scottsdale (Sec. 31-50); permit exemptions governed by the IBC 2021 Chapter 1 amendments per Sec. 31-51(b)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Scottsdale building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

Starting work before the permit is issued makes the fee double the permit fee that would have been owed. Emergency work is exempt only if a permit is obtained by the start of the next business day (IBC 109.4, Sec. 31-7).

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Scottsdale Yes Over 200
Tempe 21 mi Yes Over 200 sq ft
Mesa 21 mi Yes Building a garage needs a building permit. An attached ga…
Glendale 22 mi Yes Over 200
Gilbert 27 mi Yes Over 200
Chandler 28 mi Yes Over 120

See every Arizona city on garage work

Other work in Scottsdale

Questions people ask

How much does a garage permit cost in Scottsdale?

The code does not print a dollar amount. Fees come from the City of Scottsdale fee schedule.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Scottsdale can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.