Permit Requirements

Shed permit in Miami Beach, FL

Yes — you need a permit for shed work in Miami Beach.

The numbers
Permit needed? Yes
Where the line falls No size threshold in the code
Fee Building permit fees follow Appendix A, the city's fee schedule; the code text does not list dollar amounts.
Review time Not in the ordinance
Code section FBC 105.2
Based onFlorida Building Code 2023

Most building codes exempt a shed up to 200 sq ft. Miami Beach is stricter — a permit applies at any size.

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Miami Beach building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

Miami Beach's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Miami Beach Yes No size threshold in the code
Miami 4 mi Yes You need a building permit for a storage shed or other sm…
Hialeah 10 mi Yes You need a building permit for a storage shed or other sm…
Miami Gardens 11 mi Yes You need a building permit for a storage shed or other sm…
Doral 13 mi Yes No size threshold in the code
Miramar 16 mi Yes No size threshold in the code

See every Florida city on shed work

Other work in Miami Beach

Questions people ask

How much does a shed permit cost in Miami Beach?

Building permit fees follow Appendix A, the city's fee schedule; the code text does not list dollar amounts.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Miami Beach can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.