Permit Requirements

Demolition permit in Miami Gardens, FL

Yes — you need a permit for demolition work in Miami Gardens.

You need a demolition permit to tear down a structure or part of one. Florida's exempt list covers only gas, mechanical, and plumbing work, so demolition is not exempt. After the structure is down, Sec. 28-69 requires you to keep the vacant lot cleared and safe. Note that the underground-utility exemption in Sec. 26-56 for a single-family owner is only about locating buried lines before you dig, not about the building permit.

The numbers
Permit needed? Yes
Where the line falls You need a demolition permit to tear down a structure or …
Fee The code lists no dollar amounts. Fees are set by the city; check with the Building Division at www.miamigardens-fl.gov.
Review time Not in the ordinance
Code section FBC 105.2; Sec. 28-69
Based onFlorida Building Code 2023, as adopted by Miami Gardens (Sec. 28-45)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Miami Gardens building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

Miami Gardens's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Miami Gardens Yes You need a demolition permit to tear down a structure or …
Miramar 6 mi Yes Demolishing a building or part of one needs a permit. Bef…
Hialeah 7 mi Yes You need a permit to demolish a structure or part of one.…
Davie 9 mi Yes No size threshold in the code
Miami Beach 11 mi Yes You need a demolition permit, and you must give notice to…
Doral 12 mi Yes No size threshold in the code

See every Florida city on demolition work

Other work in Miami Gardens

Questions people ask

How much does a demolition permit cost in Miami Gardens?

The code lists no dollar amounts. Fees are set by the city; check with the Building Division at www.miamigardens-fl.gov.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Miami Gardens can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.