Permit Requirements

Above-Ground Pool permit in Johnson City, TN

It depends — some above-ground pool work in Johnson City needs a permit, some doesn't.

Prefabricated swimming pool less than 24 inches deep is exempt from permit (IRC R105.2). A pool 24 inches or deeper requires a permit.

The numbers
Permit needed? Depends on size
Where the line falls From 24 in deep
Fee The Board of Commissioners may set a permit fee schedule (Sec. 16.4); no dollar amounts appear in the code.
Review time Not in the ordinance
Code section IRC R105.2
Based onIRC 2018 as adopted statewide in Tennessee

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Johnson City building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

Doing work without the required permit violates the code. Each violation is a misdemeanor, and every day it continues counts as a separate offense (Sec. 16.6).

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Johnson City Depends From 24 in deep
Kingsport 15 mi Depends Under 24 in deep
Bristol 17 mi Depends From 24 in deep
Morristown 52 mi Depends Under 24 in deep
Knoxville 91 mi Yes From 24 in deep
Farragut 105 mi Depends From 24 in deep

See every Tennessee city on above-ground pool work

Other work in Johnson City

Questions people ask

My above-ground pool is right at the limit. Does that count?

The exemption has to fit exactly — if the code says a size or height, being at or under it keeps you exempt, and going a single inch over doesn't. When you're close to the line, measure before you buy materials, and call the department if the number is borderline.

I already built it without a permit. What now?

Johnson City can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.