Permit Requirements

Sign permit in Nashville, TN

Yes — you need a permit for sign work in Nashville.

No sign may be built, installed, or altered until you get a zoning permit, a building permit, and any other permit that applies. The property owner or the owner's legal representative files the application, and after the sign goes up the installer certifies it and a compliance tag is attached. Two things are exempt: signs listed as exempt in Chapter 17.32 that are not regulated by size, height, setback, number, or how long they stay up, and painting, repainting, or cleaning a sign structure or changing the copy on a changeable-copy sign.

The numbers
Permit needed? Yes
Where the line falls No sign may be built, installed, or altered until you get…
Fee Sign permit fees follow the commercial valuation schedule in 16.28.110, with a minimum fee of $55 to erect a sign.
Review time Not in the ordinance
Code section 17.40.490
Based onMetro Nashville Zoning Code Title 17, Chapter 17.40

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Nashville building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

A sign put up without the required permit is illegal and counts as a continuing violation, and it cannot be treated as a nonconforming sign. You get written notice and 10 days to remove it or bring it into compliance. Miss that deadline and the zoning administrator can have the sign removed at your expense.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Nashville Yes No sign may be built, installed, or altered until you get…
Goodlettsville 12 mi Yes most business/property signs require a sign permit; certa…
Mount Juliet 15 mi Yes business and other non-exempt signs; small residential an…
Nolensville 16 mi Yes required unless the sign qualifies as an Exempt Sign unde…
Murfreesboro 30 mi Yes A business or property sign needs a sign permit, unless i…
Chattanooga 115 mi Yes A business or property sign needs a sign permit before it…

See every Tennessee city on sign work

Other work in Nashville

Questions people ask

How much does a sign permit cost in Nashville?

Sign permit fees follow the commercial valuation schedule in 16.28.110, with a minimum fee of $55 to erect a sign.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Nashville can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.