Permit Requirements

Electrical Panel permit in Austin, TX

Yes — you need a permit for electrical panel work in Austin.

The numbers
Permit needed? Yes
Where the line falls No size threshold in the code
Fee Not in the ordinance — the department quotes it
Review time Not in the ordinance
Code section Utilities Criteria Manual 1.4.4 / NEC 80.19(C)(3) Exempt Work
Based onAustin Electrical Code (2011 NEC 80.19(C)) + Utilities Criteria Manual 1.4.4

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Austin building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Your contractor pulls this one, not you. Ask to see the permit before work starts.

If you skip it

Austin's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Austin Yes No size threshold in the code
Round Rock 17 mi Yes No size threshold in the code
New Braunfels 47 mi Yes No size threshold in the code
Killeen 54 mi Yes You need an electrical permit to upgrade or replace an el…
San Antonio 74 mi Yes Upgrading or replacing an electrical service panel is reg…
College Station 89 mi Yes No size threshold in the code

See every Texas city on electrical panel work

Other work in Austin

Questions people ask

I already built it without a permit. What now?

Austin can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.

Do I pull the permit or does my contractor?

Your contractor does. A licensed contractor pulling their own permit is the normal arrangement — if one asks you to pull it in your name, treat that as a warning sign, because it moves the liability to you.