Permit Requirements

ADU (Accessory Dwelling Unit) permit in Pasadena, TX

Yes — you need a permit for adu (accessory dwelling unit) work in Pasadena.

The numbers
Permit needed? Yes
Where the line falls No size threshold in the code
Fee New one- and two-family residential construction charged at $0.20 per square foot covered by roof; no permit is less than a $50 minimum (Sec. 9-60).
Review time Not in the ordinance
Code section IRC R105.2 Work exempt from permit (Sec. 9-63); a new dwelling unit is not exempt
Based on2024 IRC as amended (Pasadena Ord. No. 25-198)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Pasadena building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

Pasadena's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Pasadena Yes No size threshold in the code
League City 12 mi Yes construction of a new accessory dwelling unit (a new one-…
Pearland 12 mi Yes Building an accessory dwelling unit (garage apartment, ca…
Sugar Land 29 mi Yes Building a garage apartment, casita, or other accessory d…
Conroe 51 mi Yes No size threshold in the code
College Station 94 mi Yes No size threshold in the code

See every Texas city on adu (accessory dwelling unit) work

Other work in Pasadena

Questions people ask

How much does a adu (accessory dwelling unit) permit cost in Pasadena?

New one- and two-family residential construction charged at $0.20 per square foot covered by roof; no permit is less than a $50 minimum (Sec. 9-60).. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Pasadena can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.