Permit Requirements

Demolition permit in Boynton Beach, FL

Yes — you need a permit for demolition work in Boynton Beach.

You need a building permit to demolish a structure or part of one. The city's fire code says the Building Department issues permits for new construction, demolition, moving buildings, and renovation of existing structures.

The numbers
Permit needed? Yes
Where the line falls You need a building permit to demolish a structure or par…
Fee The dollar amount is set by the city's fee schedule, not printed in the code.
Review time Not in the ordinance
Code section Sec. 9-3
Based onFlorida Building Code 2023, as referenced by Boynton Beach Code of Ordinances Ch. 9

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Boynton Beach building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

If you work on a structure, plumbing, mechanical, or gas system before you get the required permit, the city charges a penalty of four times the normal permit fee.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Boynton Beach Yes You need a building permit to demolish a structure or par…
Boca Raton 11 mi Yes You need a permit to demolish a structure or part of one.…
Deerfield Beach 15 mi Yes No size threshold in the code
West Palm Beach 15 mi Yes No size threshold in the code
Coral Springs 21 mi Yes Demolishing a structure or part of one needs a demolition…
Tamarac 25 mi Yes No size threshold in the code

See every Florida city on demolition work

Other work in Boynton Beach

Questions people ask

How much does a demolition permit cost in Boynton Beach?

The dollar amount is set by the city's fee schedule, not printed in the code.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Boynton Beach can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.