Permit Requirements

Demolition permit in Boca Raton, FL

Yes — you need a permit for demolition work in Boca Raton.

You need a permit to demolish a structure or part of one. Every demolition permit must also include an asbestos notification statement.

The numbers
Permit needed? Yes
Where the line falls You need a permit to demolish a structure or part of one.…
Fee The dollar amount is set by the city's municipal facilities and services user fee schedule, not printed in the code.
Review time 30 days
Code section Sec. 19-90
Based onFlorida Building Code 2023, as adopted by City of Boca Raton, Code of Ordinances Ch. 19

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Boca Raton building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

If you start the work before the permit is issued, the city adds a penalty of 200 percent of the permit fee on top of the normal fee.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Boca Raton Yes You need a permit to demolish a structure or part of one.…
Deerfield Beach 4 mi Yes No size threshold in the code
Boynton Beach 11 mi Yes You need a building permit to demolish a structure or par…
Coral Springs 12 mi Yes Demolishing a structure or part of one needs a demolition…
Tamarac 15 mi Yes No size threshold in the code
Fort Lauderdale 16 mi Yes Demolishing a structure or part of one needs a permit, an…

See every Florida city on demolition work

Other work in Boca Raton

Questions people ask

How much does a demolition permit cost in Boca Raton?

The dollar amount is set by the city's municipal facilities and services user fee schedule, not printed in the code.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Boca Raton can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.