Permit Requirements

Above-Ground Pool permit in Daytona Beach, FL

Yes — you need a permit for above-ground pool work in Daytona Beach.

over 24 inches in depth (Florida Building Code standard; no local override found)

The numbers
Permit needed? Yes
Where the line falls Over 24 in deep
Fee Fee schedule established by City Commission resolution; plans review deposit required when value exceeds $10,000 (equals half the permit fee)
Review time Not in the ordinance
Code section FBC 105.2; LDC Sec. 9.1
Based onFlorida Building Code 2023, 8th ed., as adopted by reference

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Daytona Beach building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

Any person who commences work without having first obtained all required construction permits will be assessed a penalty as provided in the fee schedule.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Daytona Beach Yes Over 24 in deep
Deltona 21 mi Yes Over 24 in deep
Palm Coast 25 mi Yes From 24
Orlando 55 mi Yes From 24 in deep
Kissimmee 64 mi Yes Over 24 in deep
Melbourne 79 mi Yes Over 24 in deep

See every Florida city on above-ground pool work

Other work in Daytona Beach

Questions people ask

How much does a above-ground pool permit cost in Daytona Beach?

Fee schedule established by City Commission resolution; plans review deposit required when value exceeds $10,000 (equals half the permit fee). Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Daytona Beach can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.