Permit Requirements

Above-Ground Pool permit in Kissimmee, FL

Yes — you need a permit for above-ground pool work in Kissimmee.

over 24 inches in depth

The numbers
Permit needed? Yes
Where the line falls Over 24 in deep
Fee Not in the ordinance — the department quotes it
Review time Not in the ordinance
Code section FBC 105.2; Sec. 9-286
Based onFlorida Building Code 2023, 8th edition, as adopted by Kissimmee (Sec. 9-251)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Kissimmee building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

Kissimmee's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Kissimmee Yes Over 24 in deep
Orlando 12 mi Yes From 24 in deep
Lakeland 37 mi Yes Under 24 in deep
Deltona 43 mi Yes Over 24 in deep
Melbourne 48 mi Yes Over 24 in deep
Daytona Beach 64 mi Yes Over 24 in deep

See every Florida city on above-ground pool work

Other work in Kissimmee

Questions people ask

I already built it without a permit. What now?

Kissimmee can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.