Shed permit in Homestead, FL
Yes — you need a permit for shed work in Homestead.
A storage shed is a Building-type accessory structure, and Florida's exempt list has no Building category, so it needs a permit. The accessory-building sections shown only set setback, size, and floor rules, not the permit trigger.
| Permit needed? | Yes |
|---|---|
| Where the line falls | A storage shed is a Building-type accessory structure, an… |
| Fee | General building permit application fee: $125 minimum plus 1.5% of construction value (Sec. 6-52); state and county surcharges also apply. |
| Review time | Not in the ordinance |
| Code section | FBC 105.2 |
| Based on | Florida Building Code 2023 |
Most building codes exempt a shed up to 200 sq ft. Homestead is stricter — a permit applies at any size.
How to pull the permit
- Put together a site plan showing where the work goes, with dimensions.
- Apply through the Homestead building department.
- Pay the permit fee when the permit is issued. Work done before that isn't covered.
- Book each inspection listed on the permit as the job reaches that stage.
If you skip it
Homestead's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.
Nearby cities, same job
Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.
| City | Distance | Permit? | Where the line falls |
|---|---|---|---|
| Homestead | — | Yes | A storage shed is a Building-type accessory structure, an… |
| Doral | 25 mi | Yes | No size threshold in the code |
| Miami | 26 mi | Yes | You need a building permit for a storage shed or other sm… |
| Hialeah | 29 mi | Yes | You need a building permit for a storage shed or other sm… |
| Miami Beach | 30 mi | Yes | No size threshold in the code |
| Miramar | 36 mi | Yes | No size threshold in the code |
Other work in Homestead
Questions people ask
How much does a shed permit cost in Homestead?
General building permit application fee: $125 minimum plus 1.5% of construction value (Sec. 6-52); state and county surcharges also apply.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.
I already built it without a permit. What now?
Homestead can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.
Does unpermitted work cause problems when selling the house?
Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.