Permit Requirements

Demolition permit in Plantation, FL

Yes — you need a permit for demolition work in Plantation.

You need a permit to demolish a structure or part of one. Demolition is building work, and Florida's exempt list covers only gas, mechanical, and plumbing jobs, so it is not exempt. Before you dig or tear down near buried lines, Sec. 26-48 also bars any excavation or demolition in a right-of-way or utility easement until underground pipelines and utilities are located. The debris must be hauled by a franchised construction-and-demolition debris collector (Sec. 10-7.5 and 10-7.6).

The numbers
Permit needed? Yes
Where the line falls You need a permit to demolish a structure or part of one.…
Fee The code lists no dollar amount for a demolition permit. Debris hauling must go through a franchised collector. Amounts are on the city fee schedule at www.plantation.org.
Review time Not in the ordinance
Code section FBC 105.2; utility locate in Sec. 26-48
Based onFlorida Building Code 2023, as adopted by Plantation (Sec. 5-9)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Plantation building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

If you start work without a valid permit, the city charges a double permit fee; the code sets a charge of $400 or double the fee, whichever is greater.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Plantation Yes You need a permit to demolish a structure or part of one.…
Lauderhill 3 mi Yes You may not demolish any structure, or part of one, in th…
Davie 3 mi Yes No size threshold in the code
Tamarac 5 mi Yes No size threshold in the code
Fort Lauderdale 7 mi Yes Demolishing a structure or part of one needs a permit, an…
Coral Springs 10 mi Yes Demolishing a structure or part of one needs a demolition…

See every Florida city on demolition work

Other work in Plantation

Questions people ask

How much does a demolition permit cost in Plantation?

The code lists no dollar amount for a demolition permit. Debris hauling must go through a franchised collector. Amounts are on the city fee schedule at www.plantation.org.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Plantation can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.