Above-Ground Pool permit in Memphis, TN
Yes — you need a permit for above-ground pool work in Memphis.
prefabricated swimming pools less than 24 inches deep are exempt; above-ground pools typically exceed this depth
| Permit needed? | Yes |
|---|---|
| Where the line falls | From 24 in deep |
| Fee | Not in the ordinance — the department quotes it |
| Review time | Not in the ordinance |
| Code section | IRC R105.2 |
| Based on | IRC 2015 as amended |
How to pull the permit
- Put together a site plan showing where the work goes, with dimensions.
- Apply through the Memphis building department.
- Pay the permit fee when the permit is issued. Work done before that isn't covered.
- Book each inspection listed on the permit as the job reaches that stage.
If you skip it
Memphis's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.
Nearby cities, same job
Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.
| City | Distance | Permit? | Where the line falls |
|---|---|---|---|
| Memphis | — | Yes | From 24 in deep |
| Germantown | 11 mi | Depends | From 24 in deep |
| Jackson | 74 mi | Depends | From 24 in deep |
| Clarksville | 178 mi | Depends | From 24 in deep |
| Franklin | 184 mi | Depends | From 24 in deep |
| Brentwood | 190 mi | Depends | From 24 in deep |
Other work in Memphis
Questions people ask
I already built it without a permit. What now?
Memphis can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.
Does unpermitted work cause problems when selling the house?
Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.