Permit Requirements

Swimming Pool permit in Memphis, TN

It depends — some swimming pool work in Memphis needs a permit, some doesn't.

The only pool that needs no permit is a prefabricated one less than 24 inches deep. Any in-ground pool, and any above-ground pool 24 inches deep or more, needs a permit. The wiring and plumbing that serve the pool are separate work and are not exempt. Memphis Chapter 9-92 sets health rules for public pools at hotels, clubs and apartments, so it does not cover a pool in your own back yard.

The numbers
Permit needed? Depends on size
Where the line falls From 24 in deep
Fee Not in the ordinance — the department quotes it
Review time Not in the ordinance
Code section IRC R105.2
Based onTennessee-adopted IRC 2018

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Memphis building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

Memphis's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Memphis Depends From 24 in deep
Germantown 11 mi Depends From 24 in deep
Jackson 74 mi Depends From 24 in deep
Clarksville 178 mi Depends From 24 in deep
Franklin 184 mi Depends From 24 in deep
Brentwood 190 mi Yes No size threshold in the code

See every Tennessee city on swimming pool work

Other work in Memphis

Questions people ask

My swimming pool is right at the limit. Does that count?

The exemption has to fit exactly — if the code says a size or height, being at or under it keeps you exempt, and going a single inch over doesn't. When you're close to the line, measure before you buy materials, and call the department if the number is borderline.

I already built it without a permit. What now?

Memphis can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.