Permit Requirements

Shed permit in El Paso, TX

It depends — some shed work in El Paso needs a permit, some doesn't.

A one-story detached storage building, canopy, or structure is exempt only if it meets every condition at once: it is in the rear yard, it is under 200 square feet of floor area, and it is at least 5 feet from another structure measured eave to eave. The exemption also covers only one accessory building per site, so a second shed needs a permit even if it is small.

The numbers
Permit needed? Depends on size
Where the line falls From 200 sq ft
Fee The code only says you pay the established permit fee. The dollar amounts are set in the city fee schedule, not in the ordinance.
Review time Not in the ordinance
Code section 18.10.040 (IRC Section R105.2), Building item 1
Based onIRC 2021 as adopted and amended by the city (Ord. No. 019528)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the El Paso building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

El Paso's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
El Paso Depends From 200 sq ft
Midland 253 mi Depends Over 200 sq ft
Gilbert 325 mi Depends Over 200
Mesa 326 mi Depends Over 200
Chandler 331 mi Depends Over 120
Tempe 337 mi Depends Over 200 sq ft

See every Texas city on shed work

Other work in El Paso

Questions people ask

My shed is right at the limit. Does that count?

The exemption has to fit exactly — if the code says a size or height, being at or under it keeps you exempt, and going a single inch over doesn't. When you're close to the line, measure before you buy materials, and call the department if the number is borderline.

I already built it without a permit. What now?

El Paso can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.