Permit Requirements

Swimming Pool permit in El Paso, TX

It depends — some swimming pool work in El Paso needs a permit, some doesn't.

A swimming pool, wading pool, or pond is exempt only if the water is less than 24 inches deep and holds less than 5,000 gallons. That limit applies the same way whether the pool is in-ground or above ground. A normal backyard pool is past both limits, so it needs a permit. The barrier around it is treated as a fence, and a wood privacy fence is not exempt.

The numbers
Permit needed? Depends on size
Where the line falls From 24 in deep
Fee The code only says you pay the established permit fee. The dollar amounts are set in the city fee schedule, not in the ordinance.
Review time Not in the ordinance
Code section 18.10.040 (IRC Section R105.2), Building item 6
Based onIRC 2021 as adopted and amended by the city (Ord. No. 019528)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the El Paso building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

If you skip it

El Paso's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
El Paso Depends From 24 in deep
Midland 253 mi Depends From 24 in deep
Mesa 326 mi Yes Over 18 in deep
Chandler 331 mi Yes From 18 in deep
Tempe 337 mi Yes From 18 in deep
Amarillo 352 mi Yes You need a permit for a pool, in-ground or above-ground. …

See every Texas city on swimming pool work

Other work in El Paso

Questions people ask

My swimming pool is right at the limit. Does that count?

The exemption has to fit exactly — if the code says a size or height, being at or under it keeps you exempt, and going a single inch over doesn't. When you're close to the line, measure before you buy materials, and call the department if the number is borderline.

I already built it without a permit. What now?

El Paso can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.