Sign permit in Midland, TX
Yes — you need a permit for sign work in Midland.
You need a sign permit to install a business or property sign. Midland's sign code states a sign permit issued by the City building official is required prior to the erection, installation, repair, alteration or relocation of a sign, with limited exceptions (Sec. 11-7a-4). Temporary signs carry a separate $50.00 annual permit fee (Sec. 11-7a-11).
| Permit needed? | Yes |
|---|---|
| Where the line falls | You need a sign permit to install a business or property … |
| Fee | Temporary sign permit: $50.00 annual fee (Sec. 11-7a-11). Standard sign permit fees are in a separate schedule and not printed here. |
| Review time | Not in the ordinance |
| Code section | Sec. 11-7a-4 Permit, bond, and license requirements |
| Based on | City of Midland Municipal Code, Chapter 11-7a (Outdoor Sign Regulations) |
How to pull the permit
- Put together a site plan showing where the work goes, with dimensions.
- Apply through the Midland building department.
- Pay the permit fee when the permit is issued. Work done before that isn't covered.
- Book each inspection listed on the permit as the job reaches that stage.
If you skip it
Midland's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.
Nearby cities, same job
Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.
| City | Distance | Permit? | Where the line falls |
|---|---|---|---|
| Midland | — | Yes | You need a sign permit to install a business or property … |
| Abilene | 142 mi | Yes | Sign permit required for business/property signs; exempt … |
| Amarillo | 220 mi | Yes | You need a sign permit to install a business or property … |
| El Paso | 253 mi | Yes | A sign permit is required before a sign is placed. The pe… |
| Killeen | 266 mi | Yes | You need a sign permit to install a business or property … |
| San Antonio | 277 mi | Yes | Installing, erecting, or altering any sign requires a sig… |
Other work in Midland
Questions people ask
How much does a sign permit cost in Midland?
Temporary sign permit: $50.00 annual fee (Sec. 11-7a-11). Standard sign permit fees are in a separate schedule and not printed here.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.
I already built it without a permit. What now?
Midland can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.
Does unpermitted work cause problems when selling the house?
Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.