Shed permit in Richardson, TX
It depends — some shed work in Richardson needs a permit, some doesn't.
floor area over 40 square feet
| Permit needed? | Depends on size |
|---|---|
| Where the line falls | Over 40 sq ft |
| Fee | Set by the Master Fee Schedule |
| Review time | Not in the ordinance |
| Code section | R105.2 Building item 1 (as amended) |
| Based on | IRC 2021 as amended (Ord. 4464) |
Most building codes exempt a shed up to 200 sq ft. Richardson is stricter — the cutoff here is just 40 sq ft.
How to pull the permit
- Put together a site plan showing where the work goes, with dimensions.
- Apply through the Richardson building department.
- Pay the permit fee when the permit is issued. Work done before that isn't covered.
- Book each inspection listed on the permit as the job reaches that stage.
Either of you can pull it. When a contractor does the work, it is normally their job.
If you skip it
Richardson's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.
Nearby cities, same job
Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.
| City | Distance | Permit? | Where the line falls |
|---|---|---|---|
| Richardson | — | Depends | Over 40 sq ft |
| Plano | 6 mi | Depends | Over 120 sq ft |
| Allen | 10 mi | Depends | Over 120 sq ft |
| McKinney | 16 mi | Depends | Over 200 sq ft |
| Mesquite | 16 mi | Yes | No size threshold in the code |
| Lewisville | 16 mi | Depends | Over 200 |
Other work in Richardson
Questions people ask
My shed is right at the limit. Does that count?
The exemption has to fit exactly — if the code says a size or height, being at or under it keeps you exempt, and going a single inch over doesn't. When you're close to the line, measure before you buy materials, and call the department if the number is borderline.
I already built it without a permit. What now?
Richardson can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.
Does unpermitted work cause problems when selling the house?
Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.