Permit Requirements

Shed permit in San Antonio, TX

It depends — some shed work in San Antonio needs a permit, some doesn't.

A one-story detached shed used for tools or storage is exempt up to 300 square feet of floor area. Above that you need a permit.

The numbers
Permit needed? Depends on size
Where the line falls Over 300 sq ft
Fee Not in the ordinance — the department quotes it
Review time Not in the ordinance
Code section Sec. 10-6(e)(1)a
Based onIRC 2024 as amended by the city

Most building codes exempt a shed up to 200 sq ft. San Antonio is more lenient, allowing a shed up to 300 sq ft before a permit.

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the San Antonio building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

San Antonio's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
San Antonio Depends Over 300 sq ft
New Braunfels 30 mi Depends Over 200 sq ft
Austin 74 mi Depends Over 200 sq ft
Round Rock 90 mi Depends Over 200 sq ft
Killeen 121 mi Depends Over 20 sq ft
Corpus Christi 144 mi Depends Over 200 sq ft

See every Texas city on shed work

Other work in San Antonio

Questions people ask

My shed is right at the limit. Does that count?

The exemption has to fit exactly — if the code says a size or height, being at or under it keeps you exempt, and going a single inch over doesn't. When you're close to the line, measure before you buy materials, and call the department if the number is borderline.

I already built it without a permit. What now?

San Antonio can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.