Shed permit in Boca Raton, FL
Yes — you need a permit for shed work in Boca Raton.
You need a permit to put up a storage shed or small backyard building. Sheds are not exempt; among backyard structures only swings and other playground equipment are listed as exempt.
| Permit needed? | Yes |
|---|---|
| Where the line falls | You need a permit to put up a storage shed or small backy… |
| Fee | The dollar amount is set by the city's municipal facilities and services user fee schedule, not printed in the code. |
| Review time | 30 days |
| Code section | Sec. 19-67(8)(a) |
| Based on | Florida Building Code 2023, as adopted by City of Boca Raton, Code of Ordinances Ch. 19 |
Most building codes exempt a shed up to 200 sq ft. Boca Raton is stricter — a permit applies at any size.
How to pull the permit
- Put together a site plan showing where the work goes, with dimensions.
- Apply through the Boca Raton building department.
- Pay the permit fee when the permit is issued. Work done before that isn't covered.
- Book each inspection listed on the permit as the job reaches that stage.
Either of you can pull it. When a contractor does the work, it is normally their job.
If you skip it
If you start the work before the permit is issued, the city adds a penalty of 200 percent of the permit fee on top of the normal fee.
Nearby cities, same job
Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.
| City | Distance | Permit? | Where the line falls |
|---|---|---|---|
| Boca Raton | — | Yes | You need a permit to put up a storage shed or small backy… |
| Deerfield Beach | 4 mi | Yes | No size threshold in the code |
| Boynton Beach | 11 mi | Yes | You need a permit to put up a storage shed or small backy… |
| Coral Springs | 12 mi | Yes | No size threshold in the code |
| Tamarac | 15 mi | Yes | No size threshold in the code |
| Fort Lauderdale | 16 mi | Yes | No size threshold in the code |
Other work in Boca Raton
Questions people ask
How much does a shed permit cost in Boca Raton?
The dollar amount is set by the city's municipal facilities and services user fee schedule, not printed in the code.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.
I already built it without a permit. What now?
Boca Raton can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.
Does unpermitted work cause problems when selling the house?
Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.