Permit Requirements

Sign permit in Boca Raton, FL

Yes — you need a permit for sign work in Boca Raton.

You need a sign permit to install a business or property sign, unless the sign is one of the types listed as exempt in Sec. 24-37.

The numbers
Permit needed? Yes
Where the line falls You need a sign permit to install a business or property …
Fee The dollar amount is set by the city's municipal facilities and services user fee schedule, not printed in the code.
Review time 30 days
Code section Sec. 24-32; Sec. 24-37
Based onBoca Raton Code of Ordinances Ch. 24 (Signs)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Boca Raton building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

Boca Raton's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Boca Raton Yes You need a sign permit to install a business or property …
Deerfield Beach 4 mi Yes No size threshold in the code
Coral Springs 12 mi Yes You need a sign permit before you install or alter a busi…
Tamarac 15 mi Yes No size threshold in the code
Fort Lauderdale 16 mi Yes You must get a sign permit before any sign is erected, an…
Lauderhill 16 mi Yes You need a sign development permit before you install a b…

See every Florida city on sign work

Other work in Boca Raton

Questions people ask

How much does a sign permit cost in Boca Raton?

The dollar amount is set by the city's municipal facilities and services user fee schedule, not printed in the code.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Boca Raton can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.