Permit Requirements

Above-Ground Pool permit in Davie, FL

Yes — you need a permit for above-ground pool work in Davie.

You need a permit to install an above-ground swimming pool. The FBC exempts only prefabricated pools less than 24 inches deep; a typical above-ground pool is deeper and requires a permit, plus a residential pool safety barrier per the Florida Residential Swimming Pool Safety Act. Davie's minimum-standards code (Sec. 6-31(j)) separately regulates swimming pool maintenance and water disposal, confirming pools are a recognized regulated structure, but no local amendment adds a Building exemption.

The numbers
Permit needed? Yes
Where the line falls Over 24 in deep
Fee Permit fees are set by council resolution (Sec. 5-2); the code lists no dollar amounts.
Review time Not in the ordinance
Code section FBC 105.2 (Work Exempt From Permit); Sec. 5-1
Based onFlorida Building Code 2023 (8th ed.), Residential / Residential Swimming Pool Safety Act, as adopted by the Town of Davie (Sec. 5-1)

How to pull the permit

  1. Put together a site plan showing where the work goes, with dimensions.
  2. Apply through the Davie building department.
  3. Pay the permit fee when the permit is issued. Work done before that isn't covered.
  4. Book each inspection listed on the permit as the job reaches that stage.

Either of you can pull it. When a contractor does the work, it is normally their job.

If you skip it

Davie's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.

Already built it? How retroactive permits work

Nearby cities, same job

Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.

CityDistance Permit?Where the line falls
Davie Yes Over 24 in deep
Plantation 3 mi Yes Over 24 in deep
Sunrise 7 mi Yes Over 24 in deep
Lauderhill 7 mi Yes Over 24 in deep
Miramar 8 mi Yes Over 24 in deep
Tamarac 9 mi Yes From 24 in deep

See every Florida city on above-ground pool work

Other work in Davie

Questions people ask

How much does a above-ground pool permit cost in Davie?

Permit fees are set by council resolution (Sec. 5-2); the code lists no dollar amounts.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.

I already built it without a permit. What now?

Davie can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.

Does unpermitted work cause problems when selling the house?

Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.