Basement permit in Davie, FL
Yes — you need a permit for basement work in Davie.
You need a building permit to finish a basement or convert it into living space. Adding habitable/living area is Building work (alteration), and Florida's exempt list (FBC 105.2) has no Building category, so it is never exempt from permit. Davie's floodplain ordinance (Sec. 12-541, 12-546) also treats the lowest floor, including basement, as subject to inspection requirements.
| Permit needed? | Yes |
|---|---|
| Where the line falls | You need a building permit to finish a basement or conver… |
| Fee | Permit fees are set by council resolution (Sec. 5-2); the code lists no dollar amounts. |
| Review time | Not in the ordinance |
| Code section | FBC 105.2 (Work Exempt From Permit); Sec. 5-1 |
| Based on | Florida Building Code 2023 (8th ed.), Building, as adopted by the Town of Davie (Sec. 5-1) |
How to pull the permit
- Put together a site plan showing where the work goes, with dimensions.
- Apply through the Davie building department.
- Pay the permit fee when the permit is issued. Work done before that isn't covered.
- Book each inspection listed on the permit as the job reaches that stage.
Either of you can pull it. When a contractor does the work, it is normally their job.
If you skip it
Davie's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.
Nearby cities, same job
Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.
| City | Distance | Permit? | Where the line falls |
|---|---|---|---|
| Davie | — | Yes | You need a building permit to finish a basement or conver… |
| Plantation | 3 mi | Yes | No size threshold in the code |
| Sunrise | 7 mi | Yes | No size threshold in the code |
| Lauderhill | 7 mi | Yes | No size threshold in the code |
| Miramar | 8 mi | Yes | No size threshold in the code |
| Tamarac | 9 mi | Yes | No size threshold in the code |
Other work in Davie
Questions people ask
How much does a basement permit cost in Davie?
Permit fees are set by council resolution (Sec. 5-2); the code lists no dollar amounts.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.
I already built it without a permit. What now?
Davie can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.
Does unpermitted work cause problems when selling the house?
Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.