Electrical Panel permit in Davie, FL
Yes — you need a permit for electrical panel work in Davie.
You need an electrical permit to upgrade or replace an electrical service panel. Davie adopts the Florida Building Code, whose exempt-work list (FBC 105.2) contains only Gas, Mechanical, and Plumbing categories — there is no Electrical exemption, so service-panel work always requires a permit.
| Permit needed? | Yes |
|---|---|
| Where the line falls | You need an electrical permit to upgrade or replace an el… |
| Fee | Permit fees are set by council resolution (Sec. 5-2) and are not printed in the code; the dollar amount comes from the town's fee schedule. |
| Review time | Not in the ordinance |
| Code section | Sec. 5-1 (adoption of FBC); FBC 105.2 (no Electrical exemption) |
| Based on | Florida Building Code 2023 (8th ed.), as adopted by Town of Davie Code of Ordinances Sec. 5-1 |
How to pull the permit
- Put together a site plan showing where the work goes, with dimensions.
- Apply through the Davie building department.
- Pay the permit fee when the permit is issued. Work done before that isn't covered.
- Book each inspection listed on the permit as the job reaches that stage.
Either of you can pull it. When a contractor does the work, it is normally their job.
If you skip it
Davie's code doesn't set a specific fine for this work. In practice the department can issue a stop-work order, and unpermitted work tends to surface during a sale, when the buyer's inspector or the title company asks for it.
Nearby cities, same job
Rules stop at the city line. If your lot is near a boundary, or you work across several towns, this is where they differ.
| City | Distance | Permit? | Where the line falls |
|---|---|---|---|
| Davie | — | Yes | You need an electrical permit to upgrade or replace an el… |
| Plantation | 3 mi | Yes | No size threshold in the code |
| Sunrise | 7 mi | Yes | Upgrading or replacing an electrical service panel needs … |
| Lauderhill | 7 mi | Yes | Upgrading or replacing an electrical service panel needs … |
| Miramar | 8 mi | Yes | Upgrading or replacing an electrical service panel needs … |
| Tamarac | 9 mi | Yes | No size threshold in the code |
Other work in Davie
Questions people ask
How much does a electrical panel permit cost in Davie?
Permit fees are set by council resolution (Sec. 5-2) and are not printed in the code; the dollar amount comes from the town's fee schedule.. Valuation-based fees mean the number depends on what the job is worth, so the department quotes it when you apply.
I already built it without a permit. What now?
Davie can issue a stop-work order and require you to apply after the fact, sometimes with an extra fee. Work that was covered up may have to be opened for inspection. Full walkthrough here.
Does unpermitted work cause problems when selling the house?
Often, yes. A buyer's inspector or the title company may flag it, and lenders can balk at financing a home with open or missing permits. What to do about it.